Fabric provides a business process for specifying and deciding on engineering change requests ( ECRs) at the engineering change phase. Fabric提供一个业务流程以在工程变更阶段指定和选定工程变更请求(ECRs)。
Software maintenance is framed by fundamental Agile concepts: working from a backlog of prioritized tickets or engineering change orders, and delivering incremental releases of working software. 软件维护被基本的敏捷概念所包裹:从优先考虑的候选库中开始工作,或者改变次序,并且交付工作软件的增量发布。
Influence of Statistical Analysis of Engineering Change on Investment Control 工程变更的统计分析对投资控制的影响
Prepare, maintain, or review validation and compliance documentation such as engineering change notices, schematics, and protocols. 准备,保持和检讨确认的,执行的文件,诸如工程更改提示,图标,和条款。
To manage control and administer all engineering change activities within the engineering dept. 负责工程部门所有工程变更活动的控制和管理。
The engineering change order notifies you of changes to product features and options. 从工程变更单可以得知产品的特徵和选购项目之异动。
Coordinate engineering change timing with related parties. 与相关部门就工艺变更日程进行协调。
Product Data Management ( PDM); Engineering Change; Collaborative Product Development ( CPD) 产品资料管理;设计变更;协同产品开发。
Study on Comprehensive Evaluation Model of Hydraulic Engineering Change and Construction Claim Support System 水利工程变更综合评价模型与施工索赔支持系统研究
Product Engineering change activity. 产品工程变更。
Research on the Engineering Change Management in PDM system Based on WINDCHILL 基于WINDCHILL的PDM工程变更管理研究
On the Operation and Management of Engineering Change Performed by the Supervision Engineer On supervision engineer how to do well construction field safety production management work 论监理工程师对工程变更的操作与管理监理工程师如何做好施工现场安全管理工作
Differentiation Relationship and Application of Engineering Change and Claim 工程变更与索赔的辩证关系及其运用
Control engineering change with manufacturing department. 监控制造过程的工程更改。
Any design change or engineering change of the contracted products will result in a disposal plan of the existing finished goods stock. The position requires supplier research and will involve in traveling to factories within China. 供方或需方需要对本协议涉及的产品作设计或工程更改时,需协商处理已有的成品库存。此协调人需要在国内经常出差并进行供应商调研。
The automatic analysis principal, methods based on product structural configuration and digital mock-up ( DMU) technology were presented with regard to the Engineering Change ( EC) impact. The analysis technology for various EC types was described in detail. 对于工程更改影响的自动分析,提出了基于产品结构配置和DMU技术的自动分析的原理、方法,并对各种更改类型分析方法进行了论证。
Modeling and Implementation of Engineering Change Management in Product Data Management 产品数据管理中的工程变更管理的建模与实现
By analyzing the risk factors in the engineering change process of the automotive components, this paper establishes the analysis models of the risk factors in the engineering change processes. 深入分析了汽车零部件产品工程更改风险因素,建立了工程更改风险因素分析模型。
Research on engineering change control of collaborative product development for virtual enterprise 虚拟企业协同开发产品的工程更改控制研究
Realization of Engineering Change in PLM System PLM系统中的设计变更管理实现
Engineering Change ( EC) is an inevitable part of production data management in manufacturing industry. 工程更改是企业制造数据管理中不可避免的重要组成部分。
Engineering change is one of the most important operations in business activities involved in the enterprise production management. 工程更改是制造企业生产经营活动中的一项重要业务。
The Research of Engineering Change Management in Collaborative Working Environment 协同工作环境下的工程变更管理研究
Engineering change is to reach the goal of the time, investment and quality. 工程变更主要功能是为了实现工程的工期、投资和质量目标。
Also being a practical example of complex workflow, the engineering change process is demonstrated. 作为复杂工作流建模的应用示例,本文讨论了工程变更工作流。
Cost Evaluation on Engineering Change Management in PDM PDM工程变更管理中的成本评估
The paper explains the cause of expressway engineering change, and presents the measures to control the expressway engineering change. 通过对高速公路工程变更的原因进行分析,提出了一些控制高速公路工程变更的对策、措施。
Outline summary of manufacturing and product data, links and files changed by the engineering change process. 总结了制造大纲与产品数据的联系以及受到工程更改后的文件变更过程。
Hydraulic engineering construction shows that contract management of engineering change management is the most important factor that impact of project investment and project period. 水利工程建设表明,合同管理中的工程变更管理是工程管理中最重要的也是影响工程投资、工程工期最大的因素。